Astral Electrical · EV Charger Installation Specialists

Charge at home for $1,650, all-in.

We're Astral Electrical, the EV charging specialists — Tesla- & ChargePoint-Certified, licensed C-10. One flat price covers the whole job: your charger, a dedicated 60A circuit, pulling the permit and the final inspection — plus a free Wi-Fi security camera. City permit fees are billed separately at cost. Sized by a real NEC load calculation, for Tesla and every make. (Standard install — details below.)

Licensed C-10 #1114918 · Permitted & inspected · Financing available

The $1,650 EV install

Start my $1,650 installation

  1. 1Choose your charger.
  2. 2Pass the panel check and upload two photos.
  3. 3Pay the $165 deposit online.
  4. 4We call to schedule.
  5. 5Balance at installation.
Your installation
EV charger installation, all-in
EV charger installation, all-in
Your Level 2 charger on a dedicated 60A circuit, permit pulled and final inspection handled, plus a free Wi-Fi security camera. City permit fees are billed separately at cost.
$1,650.00 installed
Included
Panel check

A few quick answers so your price is right before you pay.

Charger
Charger location
What is the amp rating on your main breaker? (the big breaker at the top of the panel)
Does your panel have 2 empty breaker spaces next to each other?
Is your panel one of these brands: Zinsco, Federal Pacific (Stab-Lok), Challenger, Pushmatic?
Do you already have solar or a battery connected to this panel?

Need a panel upgrade? See our panel upgrade service.

Your order
  • 1 × EV charger installation, all-in, installed$1,650.00
Total$1,650.00
Deposit due today (10%)$165.00

Balance due at installation.

City permit and PG&E fees, if any, billed separately at cost with the receipt.

By entering your phone number, you agree that Astral Electrical Contractor may call and text you (SMS) at this number about your order, scheduling and service, including messages from an automated or virtual assistant. Message frequency varies. Msg & data rates may apply. Reply STOP to cancel, HELP for help. Consent is not a condition of purchase. See Terms & Privacy.

Secure checkout by Stripe. Card or bank.

Licensed C-10 #1114918 · Tesla & ChargePoint Certified · Astral Electrical. Prefer to talk? Call (650) 562-8594.

Licensed C-10 #1114918·Permitted & inspected·Own team, warrantied·Serving the Central Valley & Bay Area

Certified installer & trusted partners

Tesla Certified InstallerSPAN Certified InstallerChargePoint Certified InstallerAutel InstallerButterflyMX Certified InstallerGenerac Authorized DealerQmerit / AMP InstallerBright Saver Referral Partner
Astral
AstralElectrical
EV charging division

The EV charger installation specialists at Astral Electrical.

Our EV charging division. Tesla-Certified and ChargePoint-Certified installers who install every major EV charger — Tesla, ChargePoint, Wallbox, Autel, and more. Not a general handyman — a licensed C-10 team that does EV charging, all day.

Licensed C-10 #1114918 Tesla & ChargePoint Certified Every major charger installed
Why Level 2

The difference you feel every morning

A standard wall outlet trickles. A Level 2 charger fills the car overnight. Same garage, very different life.

120V standard outlet

~3–5 miles of range per hour

30–40+ hours to fill from near-empty — you plan your life around charging.

Level 2 (240V)

~25–40+ miles of range per hour

Fills overnight — you wake up to a full battery and never think about it.

Add-rate is approximate and varies by vehicle, battery and charger. Figures shown for comparison only.

The honest case

Why a Level 2 charger — and why now

You finally got the EV. The first week you love it — until you're moving the car at 11pm, watching the app crawl up a few miles an hour, planning your errands around a charge. And that “Future EV charger” box the builder promised? Still just an empty box on the garage wall.

Then you get it wired right — a real Level 2, permitted, Tesla-Certified. The first morning you walk out to a full battery, you wonder why you waited. After that, you never think about charging again.

What's actually going on

The 120V trap

A standard outlet adds only ~3–5 miles of range per hour — a near-empty Tesla can take 30–40+ hours to fill. You end up planning your life around charging.

The empty “Future EV” box

Builders leave a “Future EV charger” box in the garage — but it’s just an empty box until a licensed electrician runs the circuit and energizes it. It does nothing on its own.

DIY is a real hazard

An unpermitted install is a genuine fire risk — and it can fail a home inspection, complicate your insurance, and cost you at resale.

Your panel may not have room

A 48A charger needs a dedicated 60A circuit. If your main panel is 100A or 125A — or it’s a 200A panel that’s already full — there’s no room for it without a service or panel upgrade. We run a real load calculation first to see what your panel can actually carry.

NEC Art. 220 (load calculation) · NEC/CEC Art. 625 (EV branch circuit).

A Level 2 charger fills your car overnight — you wake up to a full battery, every morning, and never think about it again.

Why now — for real

Building? Beat the drywall.

The cheapest, cleanest time to run the circuit is while the garage is open, before drywall. Once the walls are finished, we’re fishing conduit — more labor, higher cost.

Capacity fills up.

Panels fill as homes add EVs, induction ranges and heat pumps. Running your EV circuit now, while there’s capacity, can save you a full panel upgrade later.

Every job, a permit. Always.

California requires a permit for EV-charger and electrical work, enforced by your city or county building department under the California Electrical Code (Title 24, Part 3). If your install includes a service or panel upgrade, PG&E will not release the meter or energize it until the city or county signs off the final inspection. We pull the permit and get every job inspected — no exceptions.

California Electrical Code, Title 24 Part 3 — permit required · PG&E Electric Service Requirements (“the Greenbook”) — final inspection & meter release required before energizing a new or upgraded service.

The permit isn't red tape — it's your protection.

An unlicensed handyman who installs your charger without a permit is gambling with your money, your home, and your family:

  • No permit, no inspection — no one ever verified the wiring is safe. A 48A circuit done wrong is a real fire risk.
  • Your insurance can deny the claim. If unpermitted work causes a fire, insurers can refuse to pay.
  • It can cost you at resale. Unpermitted electrical work shows up in a buyer’s inspection — and can kill the deal or force a costly redo.
  • The person who “saved” you a few hundred dollars is long gone. The risk stays with you.

With Astral it's done by a licensed C-10 (#1114918), permitted, and inspected — safe, legal, and yours to keep.

What waiting really costs

A single diagnostic electrician visit runs $150–300. A surprise panel upgrade mid-project runs into the thousands. A botched, unpermitted install can cost you at resale or with your insurer.

Your whole install — Tesla-Certified, permit pulled and final inspection handled, plus a Wi-Fi security camera — is one flat $1,650 (City permit fees billed separately at cost). A real licensed C-10 (#1114918), permitted and inspected. Not an app, not a handyman.

Price-certainty guarantee

We lock the flat price before we start. Anything unusual — a long run, trenching, a panel upgrade — is quoted up front after you send a couple of photos. Never a surprise bill.

Two minutes, from your phone

Send a couple of photos and we price it exactly, remotely — no truck roll, no waiting around.

See everything in the $1,650
Decide at a glance

Handyman, electrician, or licensed contractor?

Who installs your charger decides whether it's safe, legal, and yours to keep. Here's what each actually does.

What you get
Handyman
Licensed Electrician
Licensed C-10
Contractor — Astral
Pulls the permit
Work is inspected
Licensed, bonded & insured
Written contract + your homeowner rights
Safe at resale / for insurance
Tesla- & ChargePoint-Certified install
Yes Not necessarily No

Astral Electrical is a licensed C-10 electrical contractor (CSLB #1114918) — bonded, insured, Tesla- and ChargePoint-Certified, and accountable for the permit and the final inspection.

Permit & inspection: California Electrical Code, Title 24 Part 3; enforced by your city/county AHJ.

Astral Electrical · EV Charger Installation Specialists

Before you plug in, get it right

An EV charger isn't a plug-and-play appliance — it's a continuous, high-amp load that has to be sized and installed to code.

It's a continuous load

A Level-2 charger pulls ~40–48 amps for hours. Code sizes continuous loads at 125% — so a 48A charger needs a 60A circuit.

Your panel may be maxed

Stack 60A on a 100A panel already running the AC, oven and dryer and you can exceed what it's rated for — that's an overheating and fire risk.

Wire & breaker must match

Wrong gauge wire or breaker is a hidden hazard. We size conductors, breaker and connector for your exact charger and run.

Permit & inspection

A permitted install protects your home, your insurance and your resale value — and confirms the job was done right.

Building new? Wire it now

If the garage is still open, we rough-in the circuit before drywall — EV-ready on day one, no fishing walls later, and the cheapest it will ever be. We can also pre-wire for a second EV.

Rebates

CALeVIP and PG&E EV-charging rebates can offset the cost — we'll tell you what you qualify for.

Electrical Panel Capacity

Know Your Panel.Charge with Confidence.

Your electrical panel has a limited capacity. Before we install an EV charger, we evaluate your panel to make sure it can handle the extra load safely — a real load calculation, not a guess.

The result — a safe & future-ready installation

  • Correct sizing
  • Code compliant
  • Reliable performance
  • Ready for your needs

That's why step one is a quick photo of your panel — we tell you exactly where you stand before you pay anything.

Schedule my installation →

Panel capacity used

Guide
Good to go0–70%

Your panel has enough available capacity to support an EV charger.

Use with caution71–85%

Limited capacity — we may adjust the load or plan for a future upgrade.

Not recommended yet86–95%

The panel is close to its limit — an upgrade is likely needed.

Requires an upgrade96–100%

At or near full capacity — we'll increase the panel size or reconfigure.

These are general guidelines. The exact requirement depends on your property, equipment, and future plans — we confirm it with a load calculation.

NEC Art. 220 (load calculation); EVSE load per NEC 220.57.

The part that actually matters

Why your panel decides if the EV fits

We don't guess — we run an NEC 220 load calculation. Here's what it usually shows for a home adding a charger:

How full your panel gets

65A
+60A
▲ 100A limit200A capacity
Home loads — AC, oven, dryer, water heater… EV charger Over your panel's limit

A typical home already pulls about 65A. Add an EV charger's 60A and you hit 125A — 25A over what a 100A panel can safely carry (the red zone). A 200A service fits it all with room to spare.

Ask about SPAN Drive — 48A dynamic charging

A dynamic Level-2 charger that adjusts to your home's available capacity — often letting you add EV charging without a costly service upgrade. Compatible with every EV, including Tesla.

Get my EV charger quote →
SPAN Drive 48A dynamic EV charger
Done right, on the record

What's included

Your charger, installed right

We install your charger — Tesla, ChargePoint or any make — on a dedicated 60A circuit with up to 5 ft of cable/EMT from the panel. Hardwired or NEMA 14-50.

A free Wi-Fi security camera

Included with every all-in install: a Wi-Fi security camera, delivered to you in the box. Keep an eye on the driveway and the car that's charging.

Permit + final inspection

We pull the permit and handle the final inspection, on the record with your city. The City permit fee is billed separately at cost, with the receipt.

Load-calc verification

We confirm your service can carry it with a real NEC load calc — and flag a panel upgrade only if you truly need one.

Clean, safe install

Tidy conduit, labeled breaker, tested and ready to charge the same day.

New-construction & future-ready

Building? We rough-in the circuit before drywall. Second EV coming? We pre-wire so you never redo the work.

Our own work

Recent EV installs

These are our actual installs — not stock photos. Tesla Wall Connectors, outdoor runs and clean conduit by our C-10 team. Permitted, inspected, and finished the way we'd want it in our own garage.

White Tesla Wall Connector installed next to a home's electrical panel in a garage — Astral Electrical
Close-up of a white Tesla Wall Connector with its status light on, mounted in a garage — Astral Electrical
EV charger installed on the outside of a home, shown at night with its indicator light on — Astral Electrical
Clean EMT conduit run feeding an EV charger circuit from the panel — Astral Electrical
EV charger mounted on a home's stucco exterior wall — Astral Electrical
NEMA 14-50 outlet installed in a garage for EV charging — Astral Electrical
One flat price

Everything in the $1,650

No markup surprises. City permit and PG&E fees are billed separately at cost, with the receipt.

Tesla- & ChargePoint-Certified install

Your charger mounted, wired and tested by a certified installer.

A dedicated 60A circuit

Its own breaker, sized for a 48A continuous charger (within 5 ft of the panel).

We pull the permit

Filed in our name. The City permit fee is billed separately at cost, with the receipt.

The final inspection

Passed and on the record — safe for your home, insurance and resale.

A free Wi-Fi security camera

Delivered in the box with every all-in install — a genuine bonus.

Optional add-on$895 installed

Tesla Dynamic Power Management

No room in your panel? Skip the $7,500+ panel upgrade. We install Tesla's Remote Meter so your Wall Connector watches your home's live load and adjusts charging automatically — set up by a Tesla Certified Installer. $895 with the Remote Meter and installation included, added to your EV install. Requires a Tesla Wall Connector (Gen 3).

City permit and PG&E fees, if any, are billed separately at cost, with the receipt.

Dedicated circuit & sizing: NEC 625.40 (EVSE on an individual branch circuit) · sized at 125% of continuous load per NEC 625.41, 210.19(A) & 210.20(A). Permit & final inspection: California Electrical Code, Title 24 Part 3, enforced by your city/county AHJ.

Upfront pricing

$1,650, all-in — and we mean all-in

One flat price, nothing billed on the side. A recent Stockton install came in at $1,050 — these aren't teaser numbers. Send a couple of photos and we confirm it's a standard install.

The all-in EV install

$1,650

Everything to get you charging: install your charger (Tesla, ChargePoint or other) · dedicated 60A breaker · up to 5 ft of cable/EMT from the panel · we pull the permit · the final inspection · AND a free Wi-Fi security camera (yours, delivered in the box). City permit fees are billed separately at cost, with the receipt — no markup surprises.

Get my EV charger quote →

Building new?

Before drywall

Wiring a new home? We rough-in the 60A charger circuit while the garage is open — before drywall — so you're EV-ready on day one, with nothing to fish or patch later. Priced with your build; ask us to coordinate with your builder.

Get my EV charger quote →
The honest fine print: Installation only: you supply the charger, we install it. Flat $1,650 applies to homes with a 200A main panel that has available capacity, with the charger within 5 ft of the panel. We pull the permit and handle the final inspection on every install — we never do unpermitted work. City permit and PG&E fees are billed separately at cost, with the receipt. A 100A/125A or full panel, a required panel or service upgrade, longer runs, trenching, or finished-wall fishing are quoted separately after we see photos — never a surprise. CALeVIP and PG&E rebates can bring it down further.
Commercial & fleet

Commercial EV charging

Workplaces, multifamily, retail and fleet depots. We install and commission networked commercial stations — like these Autel units — sized for the site, permitted and inspected. (This is separate from the $1,650 residential install above.)

Commercial Autel EV chargers installed in a parking lot — Astral Electrical
Commercial Autel EV charger actively charging a vehicle — Astral Electrical
Pedestal-mounted commercial Autel EV charger — Astral Electrical
How it works

From two photos to charging — and what you pay, when

No money up front for the whole job. You pay as it progresses.

1

Send 2 photos

Your panel, and where the charger goes. From your phone.

2

We confirm it qualifies

A C-10 checks a 200A panel with capacity and a run within 5 ft.

NEC Art. 220 (load calculation); EVSE load per NEC 220.57.

3

Simple agreement

A clear flat-price agreement — with a 3-day right to cancel.

4

$165 deposit (10%)

Locks your spot on the schedule. That's all it takes to begin.

You pay $165
5

We pull your permit

Filed in our name with your city.

Permit fee, at cost

California Electrical Code, Title 24 Part 3; enforced by your city/county AHJ.

6

Install

We run the dedicated circuit, mount and test your charger — you're charging the same day.

Balance due

NEC 625.40 (EVSE on an individual branch circuit).

7

Final inspection

The city inspects and signs off — permitted and on the record.

California Electrical Code, Title 24 Part 3; enforced by your city/county AHJ.

Schedule my installation →

A $165 deposit is 10% of the flat $1,650 install. Any separately-quoted work is agreed in writing before it starts.

The honest part

Before you cut a corner, read this

An EV charger is not a normal outlet. It's a 40–48 amp load that runs for hours, night after night — the single appliance most likely to find the weak spot in your electrical system. So here's the truth, plainly, so you decide with your eyes open.

“What if my panel isn't 200A, is old, or full?”

Then we find out before we touch it — not after. If any of these are true, your charger may need a panel or service upgrade first:

  • It's not 200A, or it's completely full with no open slots
  • It's an old split-bus panel, or a recalled brand (Federal Pacific, Zinsco, Challenger)
  • Breakers trip, the panel feels warm, hums, or has scorch or rust
  • You already run a dryer, range, A/C or a hot tub near its limit

We size it with a real NEC load calculation, not a guess. If there's capacity, you get the flat price. If there isn't, we tell you honestly — because forcing a continuous charger onto a maxed-out or unsafe panel is how a bus bar overheats behind your wall.

NEC 220 (load calculation) · NEC 625.42 & 210.19(A)/210.20(A): a charger is a continuous load, so the circuit and service are sized to 125% of it. Paraphrased; we verify every job on-site.

“Can I still run my dryer and oven?”

Yes — that's the whole point of the load calc. We add the charger without starving the rest of your home. If the numbers are tight, you have options: a right-sized circuit, load management (the charger automatically eases off when the dryer or A/C kicks on), or the upgrade. You never have to choose between charging and laundry.

“I need to charge now. Why wait for a permit — the handyman's cheaper.”

We hear it a lot. Here's the honest math: the unpermitted, unlicensed install is the expensive one. It just sends the bill later.

  • The permit is the law, and the safety. The inspection is a second licensed set of eyes on the one circuit most likely to start a fire. We pull it on every job.
  • Heat doesn't trip a breaker. A loose lug or undersized wire on a charger won't pop a breaker — it just gets hot, for hours, inside your wall. That's the failure mode of a rushed job.
  • Your insurance can say no. A fire traced to unpermitted, unlicensed work can be denied — and then the whole house is the loss, not the charger.
  • It follows you to the sale. Unpermitted work surfaces at appraisal and resale, and it can discount or stall the deal.
  • No license, no recourse. When it fails, the handyman is gone and you own it. A licensed C-10 carries the warranty and the liability.

Cheaper today is not cheaper. Done once, done right, permitted and inspected — that's the version that actually protects the six-figure asset it's bolted to.

California Electrical Code (Title 24, Part 3) & your local building department require a permit and inspection for EV charger circuits · NEC 110.14 covers proper terminations (loose connections overheat). Paraphrased.

Our promise is simple: we'd rather lose the job than wire your home to fail. If it's safe and simple, you get the flat price. If it needs more, you get the truth. Either way, you win.

Questions, answered

How much does it cost to install an EV charger?▾

Every home is different, so the price depends on your panel, the distance from the panel to the charger location and whether any upgrades are needed. Our licensed electrician gives you the exact price after the visit. For a standard install — panel in the garage or a factory 'Future EV charger' box and a short run — the all-in price is $1,650: installing your charger, a dedicated 60A breaker, up to 5 ft of cable/EMT from the panel, pulling the permit and the final inspection, plus a free Wi-Fi security camera. City permit fees are billed separately at cost, with the receipt. Longer runs, trenching, fishing a finished wall, attic routing, or a panel without capacity are quoted separately.

Do I need a panel upgrade to install an EV charger?▾

Not always. If your panel is close to its limit, an automatic load management system (EVEMS, allowed by NEC 625.42) can add an EV charger on your existing service by reducing charging when your home is using a lot of power. It is usually faster and less expensive than a service upgrade. If an upgrade is the better option, we handle the full process, including the permit and PG&E coordination.

What size breaker does a Tesla Wall Connector need?▾

For full speed, a Tesla Wall Connector charges at up to 48A and requires a 60A dedicated circuit, because EV charging is a continuous load and the circuit must be rated at 125% of the charging current. If your panel has less capacity, the Wall Connector can be set to a lower current with a smaller breaker. Our electrician will size it for your home.

Can two or more Tesla Wall Connectors be daisy-chained on one circuit?▾

It depends on the model. The Tesla Universal Wall Connector supports daisy chaining: multiple units share one 60A circuit, limited to 48A total, and Tesla's software splits the power between the cars that are charging. The standard Tesla Wall Connector (Gen 3, NACS) cannot be daisy-chained. Each unit needs its own circuit, but up to six units can use Tesla's Power Sharing over Wi-Fi so they never overload the panel. Our licensed electrician will review your panel and recommend the best setup.

What is Tesla Wall Connector Power Sharing?▾

Power Sharing lets up to six Gen 3 Tesla Wall Connectors work as one network over Wi-Fi. One unit acts as the leader and shares the available power between all connected cars, so you can charge several EVs without exceeding the limit set for your electrical panel. Each Wall Connector is installed on its own circuit, and the electrician sets the total limit based on a load calculation.

Can I install a second EV charger if I already have one?▾

Yes. Depending on your panel, a second charger can go on its own circuit, or both chargers can share power using Tesla Power Sharing, the Universal Wall Connector daisy chain, or an automatic load management system. We will review your panel and recommend the most cost-effective option.

Do I need a permit to install an EV charger in California?▾

Yes. EV charger installations in California require an electrical permit and inspection from your city or county. Astral Electrical handles the permit and the inspection as part of the installation. The City permit fee is billed separately at cost, with the receipt.

My panel is full. Do I need a $7,500+ panel upgrade?▾

Not always. Tesla Dynamic Power Management, $895 installed: No room in your panel? Skip the $7,500+ panel upgrade. We install Tesla's Remote Meter so your Wall Connector watches your home's live load and adjusts charging automatically — set up by a Tesla Certified Installer. $895 with the Remote Meter and installation included, added to your EV install. Requires a Tesla Wall Connector (Gen 3). City permit and PG&E fees, if any, are billed separately at cost, with the receipt.

Are you a Tesla Certified Installer?▾

Yes. Astral Electrical is a Tesla Certified and ChargePoint certified installer, licensed in California (C-10 #1114918), serving all nine Bay Area counties.

Do you install Tesla and other brands?▾

Yes — Tesla Wall Connector, Ford, Rivian, ChargePoint, Grizzl-E, and universal NEMA 14-50 outlets. We match the install to your vehicle and your home.

What's the free security camera?▾

Every all-in EV install includes a Wi-Fi security camera, delivered to you in the box — a genuine bonus, not a bait-and-switch. We deliver it with the job; if you'd like us to mount and wire it too, we'll quote that separately.

I'm building a new home — should I wire for EV now?▾

Yes. If the garage walls are still open, we rough-in the 60A charger circuit before drywall — no fishing walls later, no patching, and it's the cheapest it will ever be to run. You move in EV-ready. We coordinate with your builder's schedule and price it with the build.

Are there EV charger rebates?▾

Often — California's CALeVIP program and PG&E have offered EV-charging and panel-upgrade incentives, and they change by round and by address. We'll tell you what's open when we quote. See our rebates page for what's live now.

How long does it take?▾

Most installs are done in a few hours to a day. If a panel upgrade is needed first, we coordinate both so you're charging as soon as possible.

Why do you ask for a photo of my panel before I pay?▾

Your panel decides whether a charger can be added safely. Our panel check and your photos confirm your price before scheduling, so there are no surprises on installation day.

Get my EV charger quote →

Or call a licensed electrician now: (650) 562-8594

CallTextFree assessment