Retail

Ross Dress for Less — retail build-out, Willowbrook

Ross Dress for Less · StoreCrafters · Willowbrook, CA · 2026

Full electrical tenant improvement for the Ross Willowbrook store — service and distribution, panelboards, the store lighting package, POS and systems — permitted, inspected, and coordinated with the general contractor.

Scope of work

What we did

  • Service, distribution, panelboards, feeders & branch circuits
  • Sales-floor and back-of-house lighting and fixture package
  • POS / register power and loss-prevention systems
  • Make-safe, temp power and signage power
  • Permitted and inspected; coordinated with StoreCrafters

Project at a glance

Sector
National retail

Licensed C-10 #1114918

Permitted, inspected and built to the NEC. Bonded & insured.

Why it mattered

A Southern-California Ross buildout delivered to the same national-retail standard we run across California.

Have a project like this?

A licensed C-10 electrician scopes the job and gives you an exact, upfront price — free, no obligation.

Ross Dress for Less — retail build-out, Willowbrook — Willowbrook