Ross Dress for Less — retail build-out, Willowbrook
Ross Dress for Less · StoreCrafters · Willowbrook, CA · 2026
Full electrical tenant improvement for the Ross Willowbrook store — service and distribution, panelboards, the store lighting package, POS and systems — permitted, inspected, and coordinated with the general contractor.
Scope of work
What we did
- Service, distribution, panelboards, feeders & branch circuits
- Sales-floor and back-of-house lighting and fixture package
- POS / register power and loss-prevention systems
- Make-safe, temp power and signage power
- Permitted and inspected; coordinated with StoreCrafters
Project at a glance
- Sector
- National retail
Licensed C-10 #1114918
Permitted, inspected and built to the NEC. Bonded & insured.
Why it mattered
A Southern-California Ross buildout delivered to the same national-retail standard we run across California.
More work
Related projects
Ross Dress for Less #2729 — retail build-out, 800A service
Complete electrical tenant improvement for the Ross Willow Glen store (21,224 SF) in San Jose — a new 800A service and distribution, five panelboards, the full store lighting package, POS and loss-prevention systems, permitted and inspected on the general contractor's schedule.
View project →RetailRoss Dress for Less #2756 — retail build-out, Santa Cruz
Full electrical tenant improvement for the Ross Santa Cruz store — service and distribution, panelboards, the store lighting package, POS and systems power — permitted, inspected, and handed over with a signed completion warranty.
View project →RetailRoss Dress for Less #2791 — retail build-out, Union City
Electrical tenant improvement for the Ross Union City store — service and distribution, panelboards, store lighting, POS and systems — built to the Ross prototype, permitted and inspected.
View project →Have a project like this?
A licensed C-10 electrician scopes the job and gives you an exact, upfront price — free, no obligation.