Cost guide · Bay Area / Central Valley

How much does an electrical panel upgrade cost?

A panel upgrade is the job most electrification starts with — it's the capacity that lets you add an EV charger, heat pump or solar safely. Here's what it really costs in our area, and what actually moves the number.

We're Astral — a licensed C-10 electrical contractor (CSLB #1114918). Honest ranges, permit included, your exact number from a free assessment.

Typical cost in our area

A standard 100A→200A service upgrade in our area — new panel, meter-main and disconnect, permitted and inspected — lands around $7,500–$9,500.

What you're gettingTypical range
100A → 200A service upgrade (new panel + meter-main)$6,500 – $9,500
200A upgrade + underground / service relocation$9,000 – $14,000
400A service / meter-main (large or all-electric home)$9,000 – $18,000+
Obsolete Zinsco / Federal Pacific replacementsafety-driven; usually the same scope as a full 200A service upgrade$6,000 – $9,500
Add a sub-panel$1,200 – $3,000

These are typical ranges for our service area, not a quote. Every home is different — the real number comes from a free on-site assessment and a NEC load calculation by a licensed C-10. We never promise a price online we can't stand behind.

National lead-gen sites quote a flat $1,500–$4,000 for a panel upgrade — that's a US average that ignores our reality. In the Tri-Valley and Central Valley, PG&E service coordination, local permit fees and code corrections push a real, permitted 200A upgrade higher. We'd rather show you the honest range than bait you with a number no licensed electrician can hit here.

What moves the price

Amperage (100A vs 200A vs 400A) and whether it's a meter-main combo
Overhead vs underground service, and if PG&E has to reset the meter/drop
Panel location, wall access, and how far the new run is
Code corrections found on the assessment (grounding, bonding, SPD)
Your city's permit + inspection fees and PG&E coordination

What a done-right price includes

The cheapest number online usually leaves this out. Ours doesn't.

  • A real NEC Article 220 load calculation (not a guess)
  • Permit pulled with your city + PG&E coordination
  • Modern 200A panel, grounding/bonding brought to current code
  • Inspection passed — protecting your home and resale value
  • 1-year workmanship warranty from a licensed C-10 (#1114918)

Certified installer & trusted partners

Tesla Certified InstallerSPAN Certified InstallerChargePoint InstallerAutel InstallerButterflyMX Certified InstallerGenerac Authorized DealerQmerit / AMP InstallerBright Saver Referral Partner

Questions, answered straight

Why is it more than the $1,500–$4,000 I saw online?+

Those are national averages from lead-gen sites, and they usually assume a simple swap with no permit or PG&E coordination. A permitted 200A upgrade in our area, done to code by a licensed C-10, reflects local labor, permit fees, and utility coordination — we show the real range instead.

Do I even need 200A?+

Maybe not. We run a NEC load calculation first — if your current service actually handles your plans, we'll tell you. If you're adding an EV charger, heat pump or solar, 200A is usually the safe, once-and-done move.

Is the permit included?+

Yes — always. Every panel upgrade is permitted with your city and coordinated with PG&E, then inspected. Over-permitting is never a problem; skipping it is the liability.

Get your exact number — free.

A licensed C-10 comes out, runs the load calc, and gives you a clear, upfront price for your home. No obligation.

Get my exact price

Free assessment. Licensed C-10. Usually a reply within hours.

Pick your free visit time

Loading available times… (or we'll call to schedule)

By submitting you agree to be contacted about your request. No spam.

More cost guides

CallTextGet my exact price
Electrical Panel Upgrade Cost (Bay Area / Tri-Valley) | Astral